Rehabilitation of Columns of Warehouse with Carbon Fiber

Rehabilitation of Columns of Warehouse with Carbon Fiber

Rehabilitation of Warehouse Phase 3 at Almasi Bottlers Ltd, Nyeri Plant


i. Strengthening of pads by increasing size to counter punching shear failure

ii. Introduction of shear walls in order to increase the lateral stability of the reinforced concrete frame

iii. Strengthening of columns by application of carbon fibre wrapping

iv. Strengthening of beams and slabs by application of carbon fibre strips

v. Repair of defective concrete sections by use of propriety repair mortar

vi. Repair of cracks through injection of a low viscosity structural epoxy