The main bridge of jiangsu section irrigation canal bridge
Maintenance and reinforcement of main bridge of irrigation canal bridge in Jiangsu section
carbon fiber strengtheing
General situation of Engineering
The maintenance renovation of the irrigation canal bridge of the North Jiangsu Expressway has been the first maintenance since the bridge was opened to traffic in December 8, 2000. In order to ensure the normal, safe and smooth transportation of this important north-south highway, the bridge maintenance repair project adopts non closed construction method with a construction period of 1 months.
Reinforcement time
September 2014
Reinforcement method
Strengthening method by bonding carbon CFRP
Material selection
HM carbon fiber cloth, HM carbon fiber glue