Infrastructure Repair, Retrofit, and Strengthening
CFRP
Due to the long idle time of the building, it leads to the aging of the building structure, and the original load-bearing design is no longer able to meet the current requirements.Therefore, it is necessary to use CFRP reinforce the beams, slabs, walls, and columns in the building structure as a whole
This land has been abandoned for seven years
The resumption of construction this year
The project was originally a commercial square
Construction began in July 2012
The original plan was to open on New Year's Day in 2015
But due to the funding chain rupture of the original developer, it was officially suspended in March 2016
It was auctioned off in December last year. To be taken over by a new developer
After being idle for 7 years, the project resumed construction in August this year
Expected to be completed by the end of 2024
The total project area is 15095.9 square meters
The building area is 58162 square meters
Due to the long idle time of the building, it leads to the aging of the building structure
And the original load-bearing design is no longer able to meet the current requirements
Therefore, it is necessary to reinforce the beams, slabs, walls, and columns in the building structure as a whole
The materials used in the project are all Horse construction carbon fiber sheet
The negative first floor of the project is themed around tea culture, continuing the theme of tea culture on the first floor
And gradually transition to the second, third, and fourth floors
The fifth floor is mainly used for hotel offices
After completion, it will undoubtedly become a new landmark for commercial activities in Gusu