Xinyi bridge reinforcement with steel plate and anchoring rebar
Structural strengthening materials:HM-120 steel plate bonding adhesive,HM-120M structural strengthening adhesive for steel jacketing,HM-500 injectableanchoring adhesive
Structural strengthening materials:HM-120 steel plate bonding adhesive,HM-120M structural strengthening adhesive for steel jacketing,HM-500 injectableanchoring adhesive
Engineering survey
Xinyi River bridge built in May 1967, completed in June 1969, 1269.26 meters long bridge, a total width of 8.5 meters, the bridge deck is 7 meters, O.75 meters wide sidewalks on both sides, a total of 39 holes, each hole span of 30 meters, the height of the bridge is 7 meters on water, 10 meters underwater, the design load of 13 tons of cars, hang 60 tons.
Strengthening time
July 2014
Reinforcement method
Strengthening by bonding steel plate
Plant rebar
Structural strengthening materials
HM-120 steel plate bonding adhesive
HM-120M structural strengthening adhesive for steel jacketing
HM-500 injectableanchoring adhesive